Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Friday, May 28, 2010

2 hrs
That's all I log today, but spent much more time than that. Drove up to Andice today so Seth could mill a shoulder relief on lug 1 of the new Saber prop spacer. We had lunch at the Andice general store and I got to learn a little on how to run a big vertical mill. Takes an hour of horrible driving to get up to his shop. Sure wish it was closer.

For the two hours, installed the left forward wiring conduit, reinstalled the seat rib gaps taken out when putting the control stick in, and started bolting the rollbar in place.

Also installed the new prop spacer. Just need the prop and spinner kit and it's time to work on the cowling.