Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Tuesday, February 16, 2010

.8 hrs
More firewall drilling.
Drill bolt holes for heater valve. Cut 3/4" hole for nose gear bolt.

Talked with Craig Cato today. 5-6 month lead time. But I'm going to do it. 3 blades. Not metal.
Also place a Stein air order, various electrical bits, and 2 eyeball vents. The Van's std issue are junk.
In a total abandonment of discipline and willpower, ordered one of the notch tungsten bucking bars on sale at flyboyaccessories. Been wanting one, and even though most of the rivets are set, the top skins will be a challenge. This will make it easy!