Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Saturday, July 16, 2011

Saturday, July 16, 7 hrs
Started removing plastic, takes a while to clean up. The red dye seems to etch the aluminium a bit. It didn't do that where I stripped rivet lines during construction.



Installed the N number on the left side.
Finished the roll servo details, installed safety wire, and tightened down the servo wiring connector shell.
Finally put in the 430W, and tested the heated pitot.
Started installing the wing access covers, including the comm antennas.