Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Saturday, July 9, 2011

6 hrs
Install cowling top and bottom.
Install empennage access covers and fairings.
Tighten up two screws for the 430 GPS antenna.
Install flaps. Install flap actuator side covers. Vaccuum interior.
Start removing plastic. Corrosion found on left wing leading edge.
Install lower baggage bulkhead. Trim upper bulkhead to fit canopy adjustment screw.

Took some pictures.