Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Saturday, January 2, 2010

5 hrs
Most of the time was spent preparing the Dynon heated pitot and controller for mounting to the left wing. Added heat shrink and wire sleeve to the controller wiring, and installed molex connectors for attaching to the wing wiring. Most of the prep work is done, the pitot mast is drilled, dimpled, and ready to go. Still need to final drill the mast/pitot holes, just pilots at this point.



There are photos of the entire process on the picasaweb album.

Also added a few bits of heat shrink for chafing protection to the other left wing wire bundles.
Ready to start riveting.