Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Saturday, October 25, 2008

4.3 hrs build, 2 hrs misc.
Friday disassembled the right wing frame.

Clecoed the left frame together and match drilled.

Today, Saturday, disassembled that and deburred all of the ribs and spars.
Went to Lowes and bought another pair of turnbuckles to add some safety to the wing stand. Then attached angles to the two outboard ribs for stand mounting. Mounted both spars in the wing stand, ready to start working with the skins.

Ran the LiveStrong Challenge 5K this morning. 21:49. Not bad for no real training.