Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Saturday, October 11, 2008

3.5 hrs.
Drilled left spar, deburred all drilled holes for both spars. Countersinking, and dimpling of the top flange above the root doublers. MEKd and primed both spars and their doublers.


Fred Magare visited today, to pick up the longeron angle I added to the wing order for him. He left me with all sorts of good parts, tank clecoes, tank attach Z brackets, a custom leading edge light design. It was good to meet Fred, and one of these days I'll need to visit him in way far south Austin.