First actual fabrication work!

I was determined to start on the project today instead of just looking at it. So I fabricated the 908 L&R HS attach brackets. It's done. 2.5 hours.
HS-908L&R

Also fired up the rivet gun for the first time. That thing is loud. Prep'd for tomorrow's work. Need to get casters for the second table, and I've decided to readjust the way the DRDT-2 is mounted.