Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Monday, March 7, 2011

1.2 hrs, 28 rivets

Start riveting panel attach strips to top skin. Can only go so far out before the curvature of the top skin becomes a factor.
Cleco top skin to fuselage in preparation for riveting. This will be a lot easier with two people, especially since my wrist is not 100%.

Labels arrived from Aircraft Engraving. Started affixing them to the panel.