Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Tuesday, March 15, 2011

1 hr
Spent an hour at Wayne's going through electrical system planning.
Then an hour at home on misc stuff. Attached the lower cowling with the milspec fasteners, but without using the circlips. Don't know why I didn't think of that earlier.
Then properly marked the locations of the fluid drains. The holes I already cut are way off, despite careful measuring.
Found all the hardware for finishing the lower baffle attachment. Another punch list item.
Bought primer for the fiberglass today at the local PPG outlet.