Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Sunday, March 28, 2010

2 hrs
Drill terminal blocks for wing attach to seat area ribs.
Drill holes for OAT install. I'll post a picture tomorrow. My location requires a hole through the 710 bulkhead, but that's easy enough to do and provides a support point for the wires.
Trim and solder OAT leads to length.