Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Sunday, June 26, 2011

5 hrs, 47 rivets
Started today with a visit from Jim Darrah and his Dad

Installed platenuts for left wing root fairing attach.
Rerouted pitot and AOA lines.
Installed pitot tube and heater controller. This was a pain.

Got in some time sanding on the fairings.

Ended the day with the Cub triplets lined up for a photo op. I love being at the airport.