Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Thursday, December 23, 2010

2.3 hrs
Reinstall gascolator and aft fuel line. Need to order hoses to complete the fuel system.
Label manifold pressure and carb heat electrical lines and start installing connectors. This after finalizing all 37 pin signals, including allowances for cabin temp, trim, heated pitot status and EFIS warning light.