Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Wednesday, January 14, 2009

2.0 hrs
Trial fit of all screws and bolts for left tank attach.
Fit tank and install half of screws and bolts.

Final check of left wing twist, less than a 16th.
Start clecoing top inboard skin and doubler to left wing for final riveting.

Decided to stop before installing too many rivets. I want to double check the inboard/outboard overlap. And I need to prime them before installation.