2.6 hrs
Drill 1/4" holes in bellcrank angles
Cleco and clamp bellcrank ribs to 707 and match drill.
Cleco and match drill 707, 708, and 709 bulkheads
Cut holes for static line routing.
Trim 730 doubler and ribs for lower center snap bushings.
Getting through these bulkheads is fun. They aren't too much work, and result in a large pile of parts when you're done. Next up is deburring, cleanup, and then priming. I hope to get that done tomorrow.
A trip to harbor freight is in the near future. Need a bigger vise, and 3 sawhorses!