Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Tuesday, June 23, 2009

1.9 hrs
Trimmed the cutout from 711 bulkheads. Sanded to the line, and deburred.
Match drilled 711 and 712 bulkheads.
Disassemble, deburr, dimple, countersink. The tie down bar needs countersinking.
Tap tie down bar.



Called it quits there, but not before getting the longerons down from above the garage doors!