Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Tuesday, June 9, 2009

2.5 hrs
Start deburring parts for 705 bulkhead. Got all of the filing and sanding done. The scotchbrite wheel is tomorrow. It was nice not having to deburr too much of the 904 and firewall parts. But that's over now. There's a huge pile of parts to deburr.

Cut all the various spacers, angles, and the 705B to length.



Layout the 605C bar doublers. Layed them out twice. Almost made the same mistake other builders have done, measuring from the wrong end. But the measure twice mantra revealed the error, MEK erased it, and the second time is a take.