Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011
Showing posts with label Vertical Stabilizer. Show all posts
Showing posts with label Vertical Stabilizer. Show all posts

Tuesday, January 22, 2008

Vertical Stabilizer

Started assembly of Vertical Stabilizer. 2.7 hours. On hold with the HS because of wrong AN426 rivets and weather.
Got a phone call and an email from Vans.

Returned the P60G2 wash primer and bought 5 cans of 988. But it's cold and wet, and I don't want to paint in the garage. Have to wait for better weather.

With the VS, match drilled all of the spar/rib/hinge brackets.


Strip cut the outside VS skin plastic (with a soldering iron) and deburred the edges. Got a nasty reminder why wearing gloves is a good idea with the factory new aluminium.



Clecoed the VS skin to the spar/rib structure.



Also cleaned the inside of the HS skins with soap and water in prep for priming, whenever that happens.

Finally found a torque wrench today. On sale, $10 at Pep Boys. But it only goes as low as 120 inch pounds, so it's only good for larger bolts. The search continues.