1.3 hrs
Started match drilling the center section and 970 skins to the aft fuselage. I'm at the point in the narrative where it says "At this point all the skins below the main longerons and aft of F-904 should be clecoed to the fuselage skeleton". Nowhere does it say to match drill. So I took that as the cue, and started all the match drilling.



The narrative is starting to leave out details such as this. Another example is when to drill the 915's to the 970 skins. The only defense is to read carefully, notice where major events happen, and deduce that you have to have something done by that time.