1 hr, 4 rivets
Drilled the radio stack and subpanel for #8 screws to hold down the back of the radio stack. Installed nutplates on the radio stack tabs to hold the screws. That radio stack isn't going anywhere once those screws are tightened down.
Making progress every day on the schematics. Almost done.