1.7 hrs, 2 rivets
Installed nutplate for heater cable clamp. This was reasonbly hard, but it should make maintenance a bit easier in the future.
Restarted design of radio stack. With no 327, the stack can move up. And if I remove the extra room between the 430 and the SL-40, it moves down also. Side to side remains the same. Turns out the 430 will reqire a new shell, which I just noticed. So that part has to be redone anyway.