Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Monday, November 1, 2010

1.5 hrs
Lay last layer of fiberglass on cowl inlet. This is working out way better than I expected.
Start drilling oildoor hinge reinforcement plates to cowling.



Layed out all the holes on the plates. Got the main hinge row transfered to the cowling. Will need to redo one of the rows, since it ends up right under the hinge material, and that will be the shop head side of the rivets.