Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Friday, November 27, 2009

Electric Flaps

7.5 hrs
Edge deburred all flap actuator parts.



Fabbed all small flap actuator parts.



Fit flap actuator weldment to 904 bulkhead.
Match drill center bearing block to baggage floor and rib.
Trim and edge deburr baggage center tunnel cover.
Drill safety wire hole in 661-EF.
Drill, deburr, and dimple 766A for nutplates.
Match drill 758 brackets, deburr.
Match drill 766C plate and drill 1/4" hole.