Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Friday, May 1, 2009

Flaps started.

2.5 hrs
Reinstalled the right tank. Just attached with half the screws and bolts.
Removed the left tank so that the BNC leak can be resolved.
Start removing access cover from the left tank. Used proseal on it, and it's a pain to remove.

Started the flaps in earnest.
Clecoed and final drilled flap nose rib/bracket assemblies.



The clecoed nose ribs and 8 outboard most ribs to flap spars and final drilled.