Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Friday, May 29, 2009

2.2 hrs
spent 1 hour pushing conduit into the right wing, messing with left tank, etc. Tank misbehaving. Only evidence of leak is at BNC (still!), but leaks when BNC closed off. I had previously proved that BNC was the ONLY leak by sealing it with a baloon. Argghhh.

.7 to misc to disassemble the flap/aileron construction table. Glad to have that out of the way. Well, actually, it's really in the way in a different part of the garage. Need to find someone to take it.

1.2 hrs spent storing fuse part bags. That wraps it up. Also spent a little time deburring the firewall. Fuse is started!