Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Monday, January 19, 2009

500 hours!

1.7 hours tonight pushed the meter over 500.
Worked on the right tank.
Match drilled tank attach brackets to the baffle.




Deburred brackets.
Final drilled baffle and tank ribs.
Deburred all baffle tank attach and rib holes.
Then clecoed the baffle and brackets to tank ribs, and then skin to the baffle. That's what all those clecos were needed for.




Next work session the tank is fitted to the spar, and the right wing assumes it's final form.