Flying! 8/28/2011

Tuesday, May 24, 2011

3 hrs
Snuck in a little time this morning before work, a rarity. I was waiting for traffic to thin out, but I think between LTHS and UT the year is winding down and the roads are tolerable in the morning again.
After work got to it. Along with whatever construction project needs attention, I intend to work on at least one punch list item.



Drill and sand wheel fairings after fiberglass layups.
Use double sided tape to mount baggage compartment leds.
Take airframe off the jacks.
Trim nosewheel fairing for tire clearance.
Safety wire carb heat cable.
Mark all leg fairing hinges for drilling
Start drilling left leg fairing.
After the empennage, wheel fairings, and wing tips are finished, sealed, and primed, there are no more construction items.