2 hrs
Spent this evening finishing the in place drilling on the wheel pants. All holes are drilled to final size. Then did the reinforcing fiberglass layups on all the places they're needed.
Over the weekend, put in about 16 hrs getting the wheel pants off the shelf and to this point. Also prepped the main gear leg fairings, trimmed to size, etc. Did the fiberglass layups on the leg fairings where the hose clamp fixes them to the leg.
A very productive weekend, and for a change, fiberglass was almost fun.