1.7 hrs
Drill radio stack braces.
Make and drill panel angles and SL-40 shims. Almost back to where I was on the radio stack from the first iteration. This one is working out much better so far.
Van's RV-9A in Aurora
Follow along as Chip skins his knuckles to finally have his own plane.
First flight in Chip's plane? Read this.