For Saturday, Jan 9, 2010
1 hr, 8 rivets
Ridiculously cold, so build time today and for the whole week has been restricted.
Ran conduit for the under seat/baggage floor runs. These give me 4 routes from the forward fuselage to the back. I'll use Adel clamps to secure the front of the conduits near the floor at the front of the seating area. This will keep them clear of the controls.
Also used MK-319-BS blind rivets to install the nutplates on the center tunnel ribs. Got the baggage area done, but don't have enought rivets to do the seat area. These will be for screws to hold Adel clamps for any wiring runs that have to go through the center tunnel. So in total there are 6 routes for front/back wire runs.