1.1 hrs and 5 rivets
Finished riveting spar to bottom of the elevator. The bucking bar that Granger made worked great.
Finished riveting spar to bottom of the elevator. The bucking bar that Granger made worked great.
Started on the trailing edge. Marked the wedge and started match drilling, using the 84 degree drilling guide.