Finish deburring tank ribs
flute tank ribs
Pull various tank parts.
Cut tank stiffeners.
Deburr edges of left tank skin
Fabricate Z bracket drilling guide.
Friday 1.1 hrs
Deburr tank ribs
Follow along as Chip skins his knuckles to finally have his own plane.
After putting on all of the clecos it was time to fit the leading edge to the rib. This is when I discovered I had forgotten to trim the 3rd outboard rib to clear the spar rivets. Using a rib from the right, marked where the trimming should go. The unibit made quick work of it after some pilot holes. However, this is a pain with the rest of the leading edge assembly attached to that rib, since it's taken 3 iterations of fine tuning with a dremel and it's still a bit off on the top rivet. But it was time to stop for the night.
Then fluted all leading edge ribs. The inboard 908 ribs are thicker and much more difficult to flute. Took about an hour to do that.
Finally it was time to get the leading edge skin and put it in the cradle. Tried leaving the inside skin on for a trial fit of one rib, but decided that was asking for trouble.
Peeled the plastic fom inside of left skin. Then clecoed all of the 909 ribs to top side of leading edge skin. Looks like the next step is going to be very difficult.
Bottom skins match drilled. The next step is to take 'em all off.
Then started the leading edges. Of course this meant 2.5 hours of deburring ribs. Got them mostly done, should finish it tomorrow.
The inboard bottom skin ready to cleco on.
First flight in Chip's plane? Read this.