Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Sunday, July 31, 2011

6 hrs for July 30.
Not making much progress. Put up the scales, done with weight and balance. Mailed off the program letter to get on the schedule for inspection.
Wheeled the plane outside and took pictures, with the cowling and wingtips in place.






Rolled it back in and started taking it apart to finish up and get ready for inspection.



Finally installed the experimental graphic. It looks great!

Spent a lot of time installing the wing root fairings and doing a trial fit of the upper gear leg fairing.
Installed the aft and main seat belt points.