5 hrs, 47 rivets
Started today with a visit from Jim Darrah and his Dad
Installed platenuts for left wing root fairing attach.
Rerouted pitot and AOA lines.
Installed pitot tube and heater controller. This was a pain.
Got in some time sanding on the fairings.
Ended the day with the Cub triplets lined up for a photo op. I love being at the airport.