6 hrs
More misc stuff. Going to run out of these tasks and then I'll have to work on the canopy fairings.
Finish installing transponder.
Install panel.
Install switches and leds.
Finish installing air vent ducts.
Start installing aux power jack.
Start installing parking brake cable,
More sanding on cowling.
Sand HS fairing.
Start installing tail light on rudder bottom cap.