4.5 hrs
Finished reinstalling the gascolator. Installed the 90 degree fuel fitting and tightened it down.
Continued working on the radio stack bracket assembly. Drilled the .o40 side braces.
Refined the position on the panel, moving it left about a half inch. This give enough clearance for the right side Skyview and the ELT switch at the extreme right. Had to expand the cutout on the sub panel a little. Every thing looks like it will clear and work together properly.
Decided how to brace the stack to the sub panel, will use extra shims ( sort of needed anyway) and some angle and the whole assembly will get locked together nicely.