Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Monday, February 15, 2010

.8 hrs
Ramp duty this week at 3R9. There was a beatiful F1 Rocket tied down tonight.

Drill pilot holes for bottom center firewall through holes.
Cut and deburr hole for heater valve.



Started an order for the Skyview appliances I'll need. The ADAHRS are now in the critical path, because they have to be installed before the aft top skin can be riveted on, which has to be done before the canopy can be done. So ordered those, network cables, engine monitor kit and accesories, pretty much everything except for the displays.

Also trying to reach Craig Catto about a prop. That 3 blade prop sure will look nice.

Oh, and the Grove nose wheel arrived.