Van's RV-9A in Aurora

The Big Picture

The Big Picture
Flying! 8/28/2011

Thursday, September 24, 2009

1 hr
Removed left 970 skin.
Stop drilled, dressed and deburred crack at aft lower corner bend.



Cut 1" hole for fuel line grommet.
Start deburring holes.