1.4 hrs spent on wing kit inventory. Worked through the miscellaneous bag and verified all bags were there. But still need to do a detailed inventory of the hardware in each of those 37 bags. About half of them are rivets, and they don't need counting, but it's now clear why some builders are claiming 7 hours for the inventory.
Also spent about .5 hrs finishing tear down of the long crate. Those things have a lot of staples in them. I have blisters from pulling them all out.